Fully Automatic Textile DTY Paper Tube Packaging Equipment

US$5,000.00 - 43,000.00 1 Set (MOQ)
Port:
Qingdao, China
Production Capacity:
One Set Per Month
Payment Terms:
L/C, T/T, D/P

Last Login Date:

Oct 05, 2025

Main Products:

pagoda paper tube machines

Find Similar Products
US$200,000.00-300,000.00
1 Set (MOQ)

Product Description

Company Info

Basic Info.

Model NO.
DTY 9-8
Type
Spinning Production Line
Automation
Automation
Spinning Method
Rotor Spinning
Processing Material
Slik
Producing Process
Non-woven Fabric Equipment
Certification
CE, ISO9001: 2000
Warranty
24 Months
Customized
Customized
Condition
New
Packing Material
PE Heat Shrinkable Film
Packing Speed
60-70 Paper Tubes/Min
Number of Paper Tubes
60 Paper Tubes/Bag
Energy Consumption
20 Packs of Paper Tubes/Kwh
Trademark
Weifang Xinyang
Transport Package
Marine Transportation
Origin
Shandong, China

Product Description

 
Product Description

NameDTY paper tube packing machinePLC controllerXinJe
SpecificationDTY-9-8DTY paper tube sizeThickness: 3 mm
Inner diameter: 69 mm
Height: 290 mm
Arrangement9*8 arrangementNumber of layers arranged1st floor, 7 rows
Packing materialPE heat shrinkable filmPacking bag size980mm+1000mm
Packing speed60-70 paper tubes/minDTY paper tube package size470mm+690mm
Number of paper tubes60 paper tubes/bagDTY paper tube packing weightAbout 10 kg
Company Profile

Frequently asked questions

Frequently asked questions

1.Are you a trading company or a manufacturer?
We are a factory
2.How long will it take to get a quote?
We will usually reply within 24 hours after receiving your inquiry.If you are in urgent need of a quotation, please feel free to call me or tell us by email, and then we can reply to you as a priority.
3.How is the quality of your machine, we are worried about the quality.
We are a manufacturing factory with nearly 30 years of R&D and manufacturing experience. Many customers have used our equipment for 15 years and continue to use it. More importantly, we attach great importance to our reputation.The best quality has always been our principle, You can rest assured of our production.
4..How long is your delivery time?
If there is stock, it will be within 30 days, and if it is a customized machine, it will be about 60 days.
5.Why didn't anyone reply to me?
Our employees are online 24 hours a day.If no one responds to you, maybe he has other things for the time being.So please send your ask to stay on the email or chat tool and we will get back to you as soon as possible.


 
Send your message to this supplier
Miss May Yu

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes